Skip to page content
Logo PT Bahana Bhumiphala Persada PT Bahana Bhumiphala Persada

MoveMetric

Production, quality, warehouse, and shipment movement in one secure view.

Login

Access the MoveMetric production dashboard for PT Bahana Bhumiphala Persada securely.

BBP
MoveMetric
Production operations
Overview
Planning
Monitoring
Production data
Administration
User Workspace member
MoveMetric>Dashboard

Loading production data...
PT Bahana Bhumiphala Persada© MoveMetric

Planning and monitoring

Moving Matrix

View item progress across workcenters, from Asy Core through Exim, by shift.

Production summary

Review actual output and balances by sales order.

Dashboard KPI

Compare production progress across all workcenters in real time.

Master Plan

View plan access status. Excel files and plan controls require planner access.

Refinishing analysis

Track defect rates, refinish distribution, and refinish share by sales order.

Assembly Monitoring

Monitor daily and monthly Assembly PO targets against actual production output by shift and sales order.

Finishing Monitoring

Track daily and monthly Finishing output separated by Finish Core and Finishing processes.

Delivery Monitoring

Monitor monthly delivery volume trends (m³), Exim shipment status, and product stuffing breakdowns.

Workcenter production data

Assembly

Production movement records for Asy Core and Asy Finish.

Finishing

Production records for Finish Core and Finishing.

Quality Control & Final Inspection

Quality inspection records for QC Pass and Final Inspection.

Packing

Packing records for finished goods.

Exim

Delivery orders and shipment status.

Auto forecasts
From to
DAFTAR SO

Summary search

0 records
All Status
All Status
Open
Closed
All buyers
Matrix date range
to
ACTIVE ERP SCHEDULE · MOVING MATRIX SOURCE
Checking database...

Month Plan drives each month’s Moving Matrix targets and carryover calculations in Supabase.

Active schedule

Plan volume & target breakdown

Comparison between carryover backlog, current month plan, and combined active target.

Update the production plan

Upload via G-Drive
i
Google Drive will open in a new tab.

Upload the latest Excel Month Plan to the folder, return here, then select Update Month Plan & Matrix.

Run Month Plan and Moving Matrix updates from Data Sync.

Month plan files · Google Drive

File name Size Uploaded Actions
View-only access · Download enabled: Month Plan is the basis for the Moving Matrix calculations shown for each month. All users (including Viewers) can download the active Master Plan file for reference without edit permissions. Uploading or deleting plan files requires Planner or Administrator access.

Confirm sync

ERP automation

Complete

ERP sync status

Database

Loading data...

Choose a workcenter

Select a workcenter to review its movement history.

From to
Filter:

Good evening 👋

Here's your production pulse.

✳ PRODUCTION BRIEF ·

Your production pulse is ready. Review shipment timing and workcenter progress.

Monthly production trend

Actual production volume against monthly target

Actual vs target: —

Exim status

Sales orders by shipment status

0total orders

Sales order status

Open orders compared with closed orders

Upcoming stuffing

Scheduled orders that have not shipped

Stuffing dateBuyerSales orderItem codeItem nameQty (pcs)Volume (m³)
No orders found for this period.
Choose another month or clear the filters to see more production data.

Production by workcenter

Adjusted output compared with monthly target (m³)

Order progress

Ready to ship passes only when every workcenter is complete. Shipped orders close earlier stages for tracking.

Sales orderBuyerOrder qtyOrder volumePlanned stuffingReady to ship sinceProductExim status

Order progress detail

Shipment planning

Select a delivery to review its buyer, order, products, and volume.

ShippedUpcomingOverdue

Delivery details

Notification Center

Monitoring Shipping, Packing, Production & Refinishing.

Browser push alerts for real-time factory events.
Click any item to open & mark read
GitHub Actions Automation · ikhsan-ardian/bbp-movemetric ↗ Checking connection…

Production Data & Dictionary Sync Center

Trigger the complete end-to-end production pipeline or run individual workcenter synchronization workflows independently.

SECTION 1 · FULL WORKFLOW PIPELINE main.yml Estimated duration: ~2.5 mins

Full Production & Dictionary Pipeline (Run All Steps)

Executes the complete sequence automatically: updates the Item_Master vertical dictionary first, translates Assembly & Sanding production, syncs QC Pass & FI, updates Packing & Exim, processes Refinishing (LU), calculates LU Material Costs, and rebuilds the Moving Matrix.

1 Item Master Dictionary → 2 Production (Assembly & Sanding) → 3 QC Pass & FI → 4 Packing & Exim → 5 Refinishing (LU) → 6 LU Material Costs → 7 Moving Matrix
SECTION 2 · INDEPENDENT MODULES 9 Standalone Modules

Independent Workflow Modules

Run a specific module on demand without triggering the entire production pipeline.

MODULE 1 · DICTIONARY sync_item_master.yml

Item Master Dictionary Only

Rebuilds the vertical Item_Master dictionary (Regular & Refinishing/LU items) from the master source spreadsheet before translation.

MODULE 2 · PRODUCTION sync_produksi.yml

Production (Assembly & Sanding)

Runs sync_produksi.py to translate and synchronize Assembly & Finishing Sanding output to Google Sheets and Supabase.

MODULE 3 · QUALITY sync_qc_pass.yml

QC Pass & Final Inspection

Runs sync_qc_pass.py to synchronize Quality Control Pass and Final Inspection (FI) inspection records.

MODULE 4 · WAREHOUSE & EXIM sync_packing_exim.yml

Packing & Exim Only

Runs sync_packing_exim.py to update finished goods Packing stock, planned stuffing dates, and Exim shipment status.

MODULE 5 · REFINISHING sync_lu.yml

Sync Refinishing

Runs sync_lu.py independently to synchronize Refinishing defect quantities, shift distribution, and order ratios.

MODULE 6 · LU COSTS sync_material.yml

Refinishing Material Costs

Runs sync_material.py to synchronize LU veneer & glue material usage lines and cost totals to Google Sheets and Supabase.

MODULE 7 · MOVING MATRIX moving_matrix.yml

Rebuild Moving Matrix Only

Runs moving_matrix.py independently to recalculate FIFO allocations, workcenter lead times, balances, and the Moving Matrix schedule.

MODULE 8 · PO ASSEMBLY sync_po_assembly.yml

Sync PO Rencana Assembly Only

Runs standalone sync_po_assembly.py to parse uploaded Assembly PO PDFs and synchronize rencana_po_assembly to Supabase and Google Sheets without affecting other workflows.

MODULE 9 · PO FINISHING & BOM sync_po_finishing.yml

Sync PO Rencana Finishing & BOM Only

Runs standalone sync_po_finishing.py (after local HANA BOM/PO refresh) to auto-verify SAP PO numbers, 1-line BOM raw materials, and synchronize rencana_po_finishing to Supabase and Google Sheets.

Live Workflow Execution Monitor

Execution progress percentage and script stages update automatically every 4 seconds while a workflow is running.

View All Runs ↗
GitHub Actions API Connection

Configure GitHub Sync Token

If your local server does not have GITHUB_TOKEN set in .env, enter a GitHub Personal Access Token (PAT) with repo and workflow scopes below. MoveMetric will trigger and monitor workflows directly via the GitHub REST API.

How to create a token: Go to GitHub Settings → Developer settings → Personal access tokens, enable repo & workflow permissions, and paste the token here (or add GITHUB_TOKEN=ghp_... to your local .env file).

Filters:
to
All sales orders

Total refinishing quantity

0 Pcs

Total order production

0 Pcs

Defect Rate (LU)

0%

Total LU Material Cost (Rp)

0

Top 5 Refinish orders by quantity

Shift distribution

0pcs refinished

Refinish item mix by order

All sales orders

Refinishing output and linked material costs for the selected date range and Sales Orders.

Showing 0 records

A dash in No. SO means the Sales Order is missing. Contact the Production Admin to complete it. A dash in Order Qty means the product item has not yet been included in the active Month Plan.

DATE SHIFT NO. SO BUYER ITEM CODE ITEM NAME ORDER QTY REFINISHING QTY VOLUME (m³) TOTAL COST (RP) % REFINISHING / SO
Item Master MaterialStandard material codes, names, units, and current unit prices for production.Click to expand or collapseLoading materials...
DateItem CodeNameCategoryUnitUnit Price (Rp)
Item Master ProductNew item codes and names, grouped by Packing family and production stage.Click to expand or collapse1,806 products
BOM Master All-Process Bill of Materials (ASY CORE, FINISH CORE, ASY FINISH, FINISHING & Material Components: Veneer, Barecore, Premix/Lem) synced from DB_BOM - SO.xlsx. Click to expand or collapse Loading BOM...
Loading BOM Master...
Father Code Father Description Child Code (Raw Material) Child Description Koefisien (Qty) Satuan (UoM) Tipe Item
1 / 1
From to

Monthly output trend

Daily planned PO target compared with actual assembly output across the month, sourced from the Assembly PO Database and Assembly Workcenter Database.

PO plan Actual output

Shift target vs actual

Planned PO target against actual assembly output by shift for the active filter period.

PO plan Actual output

Assembly plan vs actual comparison

Comparison of scheduled PO targets against actual production output from the Assembly PO Database and Assembly Workcenter Database.

0 items

Unplanned actual assembly output (outside daily PO schedule)

Actual assembly production recorded in the Assembly Workcenter Database outside the active daily PO schedule.

0 records
Date Shift Sales Order Process Item Code Item Name Buyer Actual (Pcs) Actual (m³)
From to

Monthly PO plan vs actual trend

Daily planned PO target compared with actual finishing output across the month, sourced from the Finishing PO Database and Finishing Workcenter Database.

PO plan Actual output

Shift target vs actual

Planned PO target against actual finishing output by shift for the active PO period.

PO plan Actual output

Finishing plan vs actual comparison

Comparison of scheduled PO targets against actual production output from the Finishing PO Database and Finishing Workcenter Database.

0 scheduled items

Unplanned actual finishing output (outside daily PO schedule)

Actual finishing production recorded in the Finishing Workcenter Database outside the active daily PO schedule.

0 records
Date Shift Sales Order Process Item Code Item Name Buyer Actual (Pcs) Actual (m³)

Output by sanding machine

Finishing output across sanding machine lines (IMEAS & TIME SAVER) for the selected filter period.

Finish Core Finishing

Shift output by process

Actual Finish Core and Finishing output across Shift 1, Shift 2, and Shift 3.

Finish Core Finishing

Monthly delivery trend

Monthly Exim delivery volume (m³) compared with shipped volume across months, sourced from the Exim Workcenter Database.

Total Exim delivery (m³) Shipped volume (m³)

Exim delivery status

Sales orders and volume (m³) by shipment status

0total orders

Top 5 buyers by delivery volume

Highest Exim delivery volume (m³) by buyer for the selected period, separated by Shipped and Open/Upcoming volume.

Shipped (m³) Upcoming / Open (m³)

Exim Stuffing Reschedule History

0 rescheduled orders

Tracks changes to planned stuffing dates when Exim reschedules a Sales Order across sync updates or manual records.

Delivery & stuffing product breakdown

Complete product-level breakdown sorted ascending by stuffing date from the Exim Workcenter Database.

0 product lines
Exim Schedule Audit Trail

Exim Stuffing Date Change & Reschedule History

Record / Update Exim Stuffing Reschedule

Recorded Stuffing Date Changes
Sales Order Buyer Period Previous Date New Stuffing Date Delta Detected / Synced At Note
From to

Assembly PO schedule database

Master schedule of daily Assembly Production Orders used as the baseline target for assembly monitoring.

0 rows
Date Shift Sales Order PO Number Order Qty Process Item Code Item Name Buyer Target (Pcs) Target (m³) Action
From to

Finishing PO schedule database

Master schedule of daily Finishing Production Orders sorted ascending by date and shift.

0 rows
Date Shift Sales Order PO Number Order Qty Process Item Code Item Name Buyer Target (Pcs) Target (m³) Raw Material Code Raw Material Name Action

Create / Revise Assembly PO

No. Date Shift Sales Order PO Number Order Qty Process Item Code Item Name Buyer Target (Pcs) Target (m³) Action

Edit Assembly PO Item

Update target quantity, volume (4 decimals), shift, or item details.

Create / Revise Finishing PO

No. Shift Sales Order PO Number Order Qty Process Item Code Product Description Buyer Target (Pcs) Target (m³) Raw Material Code Raw Material Name Action

Legend and system guide

1. Workcenter forecast cards

Estimated dates for the next workcenter when actual data is not available:

  • Finish Core: Estimated +2 days after Assembly Core.
  • Finishing: Estimated +1 day after Assembly Finish.
  • Quality Control & Final Inspection: Estimated +1 day after Finishing. Both workcenters appear together.
Forecast cards use a dashed outline and the (AUTO) label.

2. User interactions

  • Select a card: Focus the sales order and show its production flow.
  • Expand a card: Expand the card to view its Item Code and Item Name.

3. Production status

OPEN (Balance > 0)
CLOSED (Balance ≤ 0)

Confirm

Starting sync...

GitHub Actions is processing the production data in the background.

User access